How long does it take to produce and deliver custom boxes? | Winpack Guide
How long does it take to produce and deliver custom boxes? This article addresses the most common timeline concerns in custom boxes packaging, including production speed, delivery variables, and what influences turnaround times. We provide credible, concise information to help professionals set expectations and plan effectively.
How Long Does It Take to Produce and Deliver Custom Boxes?
Key Timeline Factors
- Order Size
- Small runs (100-500 units): 7-10 business days for production
- Mid-to-large runs (1,000+ units): 10-20 business days
- Box Type and Complexity
- Standard corrugated boxes: Shorter lead times (7-12 days)
- Complex die-cuts, specialty coatings or inserts: Add 2-5 days to production
- Design Finalization
- Digital proof approval: 24-72 hours after artwork submission
- Design changes or revisions: Add 1-3 days per revision cycle
Production and Fulfillment Stages
- Artwork Approval:
- Clear, print-ready files speed approvals; delays often occur due to low-res artwork or missing files
- According to Packaging World, nearly 60% of delays are artwork-related
- Production Scheduling:
- High-volume periods (Q4, spring launches): Potential extra 2-5 days
- Partnerships with trusted vendors can mitigate scheduling risks
- Quality Assurance:
- Quality control may require 1-2 days, especially for High Quality finishing
Shipping and Delivery Variables
- Shipping Method:
- Ground shipping: 2-5 business days within North America
- Expedited shipping: Next-day to 2-day options available at a High Quality
- Geographic Location:
- Urban and central locations: Faster delivery times
- Rural or remote areas: Add 1-3 days
- Custom Clearance (For International Orders):
- Customs can add 3-7 days, per the World Trade Organization's logistics data
Ways to Reduce Lead Times
- Submit final, print-ready artwork for first upload
- Consolidate order specs before confirmation
- Opt for standard box styles and sizes
- Use local suppliers to minimize shipping times
FAQ: Quick Reference
- Average time from order to delivery: 14-25 business days, depending on complexity and shipping
- Fastest possible turnaround: 7 business days for rush orders with standard boxes and artwork
- What can delay my order? Artwork issues, design changes, peak season production, and customs
Sources:
- Packaging World
- World Trade Organization
- The Paperboard Packaging Council
SEO





About Printing Craftsmanship
What are eco-friendly printing options?
Vegetable-based inks instead of petroleum-based inks.
Recycled paper or sustainably sourced materials.
Water-based coatings instead of harmful chemical coatings.
Digital printing to reduce waste and energy consumption.
About Us
When I can get the quotation?
Generally we will quoted to you in 2 hours after you provide the details of the box( Size, material, craft, accessories and other details)
How to start the mass production?
Once received the 30% deposite, we will arrange the mass prouction.The balance need to be paid before delivery.
Are you a manufacturer?
Yes, we are manufacturer, and we have over decade experience in this field.
Rigid Magetic Boxes
How long does it usually take from design confirmation to delivery?
The lead time is usually 15-25 days, depending on the production of the order




Start Your Packaging Journey Today
Discover Our Curated Collection of Bespoke Packaging Cases & Tailored System Solutions
© 2025 WINPACK PRINTING. All rights reserved
Wenhua MO
wenhuamomo